Contact Us | (636) 343-1211

Contact Us | (636) 343-1211

Aschinger engineers a new 120 kW DC elevated photovoltaic array

Aschinger engineers a new 120 kW DC elevated photovoltaic array

As a part of IBEW Local 1’s building renovation, Aschinger, in partnership with Azimuth Energy, engineered and constructed a new 120 kW DC elevated photovoltaic array on IBEW’s parking lot. IBEW added 4 dual-port electric vehicle charging stations to the array as well. IBEW Local 1 received a rebate from Ameren Missouri for investing in green energy solutions at their facility. This produces an estimated 160,000 kWh annually, the equivalent of powering approximately 15 average sized homes for one year.

  

No comments

WHAT PEOPLE ARE SAYING

The layouts adapts to the Screen Size of whatever device visitors are using. Nulla consequat.

  • “Shelli and Greg  and Fred and everyone at Aschinger provide great service to TLC, and we appreciate it very much.”

  • “Last week when I was on site I had a chance to talk with two of your electricians, Denny and Rich Butteiger.     I was talking to them about the project and specifically the work they were doing (which was awesome).   It was great to hear them talk with passion and pride about their work.  We also talked about safety and that they saw being safe as much a part of their work as the work itself.

    Again, we appreciate the safety attitude and quality of work that Aschinger puts in place every day.”

     

  • “We’re writing to commend the quality of service provided to Union Avenue Christian Church by two members of your organization.  Frank Laks and Adrian Ellis worked together to solve an exterior lighting dilemma that has plagued our facility for many years…(they) took great care of our century-old building, providing a solution that was implemented with professionalism and attention to detail.”

  • “Over my career I have had the pleasure of working with a handful of craft workers who possess a truly advanced set of talents and knowledge, and I would certainly put Jeff in this category. We all rely heavily on our key field supervisors like Jeff and I think sometimes take their superior performance for granted. That is why I wanted to take the time to make you and your organization aware of the valuable asset that Jeff is to Aschinger Electric.”

  • “We were quite pleased with Aschinger.  Our previous infrascan company wasn’t nearly as thorough.”

  • “I would like to offer my sincere thanks and appreciation to Aschinger for a great job. Everyone involved was knowledgeable and professional. This was a monumental achievement for both Duke and Aschinger and we should be proud of the results.”